Material handling in construction
In the construction industry, the term 'material handling' refers to the delivery, movement, storage and control of materials and other products. This forms part of the logistics management of a project.
Types of plant used for material handling on site include; hydraulic excavators, telescopic handlers, cranes, forklift trucks, lifting devices, conveyor systems and so on.
From receipt and inspection of materials, through to storage, assembly and use, the material handling system should be well-coordinated and organised so that everyone on site is aware of how it works. When handling materials, safety should be the primary consideration. Pre-start inspections are critical, load limits should not be exceeded, method statements should be followed, and it may be necessary for a banksman to direct material movements around the site.
It is important to follow best practice guidelines when designing a material handling system for a construction project. For example:
- The proposed system of material handling should be defined in terms of needs, objectives and functional specification.
- Methods and processes should be standardised to avoid confusion.
- Unnecessary handling or movement should be reduced or eliminated.
- Working conditions and methods should have worker safety as the primary objective.
- Unit loads should be optimised, to reduce work and risk.
- Storage areas should be kept organised and clean, maximising density as much as possible and eliminating damage to materials.
- Sites should be kept safe, clean and easy to move around.
- Deliveries should be received and handled promptly.
- Site waste management plans should be created and maintained.
- Automated material handling technologies should be used where practicable.
- Safety equipment such as PPE should be available.
Incorrect manual handling is a common factor in work-related injuries. This can be because of:
- The weight of the item being handled.
- The repetitive nature of the movement.
- The distance the item is being moved.
- Where the item is being moved to and from.
- The posture of the individual. Any twisting, bending, stretching or other awkward position may exacerbate problems.
The Manual Handling Operations Regulations place obligations on employers to manage the risks of manual handling to their employees. For more information see: Manual handling.
[edit] Related articles on Designing Buildings Wiki
- Construction materials.
- Construction plant.
- Don’t run short of materials on your construction project
- How to manage construction plant.
- Logistics management.
- Manual handling.
- Materials on site.
- Off site materials.
- Protecting and storing rebar.
- Quality control.
- Resource management plan.
- Site storage.
- Site Waste Management Plan.
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February
Comments
Good points, we wrote a similar guide but aimed more specifically at the groundworks sector: https://www.sitestak.co.uk/news/how-to-store-pvc-drainage-materials-and-pipe-prior-to-installation